Lift Plan Guidance UK
Practical guidance for preparing lift plans, method statements, lift schedules and evidence packs for construction lifting operations.
Plant-specific guidance for Appointed Persons, contractors and site teams preparing lift plans under UK construction expectations. Includes planning considerations for OHLE, GS6, ground bearing, temporary works, wind, lifting accessories, LOLER, PUWER, CAA crane notification and rail-adjacent operations.
Use this library to find practical guidance for crane lift plans, excavator lift plans, telehandler lift plans and static lifting plans. Each page is written around real planning questions: what must be checked, what evidence should be recorded, and when AP, TWC, engineer or competent-person review is needed.
Practical guidance for preparing lift plans, method statements, lift schedules and evidence packs for construction lifting operations.
Planning prompts linked to LOLER Regulation 8, PUWER, BS 7121 principles, competent review, AP duties and site-specific approval records.
Focused checks for ground bearing, crane mats, outrigger loads, piling mats, overhead lines, GS6 controls and temporary works sign-off.
Tower crane lift planning guidance for UK sites covering LOLER, BS 7121, AP duties, zoning, oversailing, OHLE/GS6 controls, foundations, temporary works and lifting management.
Read guidance Crawler crane lift planning guidanceCrawler crane lift plan guidance for UK construction sites covering LOLER, BS 7121, ground bearing, crane mats, temporary works, OHLE/GS6, travel routes and AP review.
Read guidance Mobile crane lift planning guidanceUK mobile crane lift plan guidance covering LOLER, BS 7121, AP planning, outrigger loading, ground bearing, temporary works, OHLE/GS6 and exclusion zones.
Read guidance Excavator lift planning guidanceUK guidance for excavator lift plans covering LOLER, CPA/SFPSG guidance, AP planning duties, quick hitch allowance, ground conditions, OHLE/GS6 and lifting accessories.
Read guidance Static lifting guidanceStatic lifting plan guidance for ME&I, plant rooms, beams, frames, temporary works, chain blocks, gantries and controlled non-crane lifting operations on UK sites.
Read guidance Telehandler lift planning guidanceTelehandler lift plan guidance for UK sites covering LOLER, suspended loads, forks, jib attachments, load charts, ground conditions, OHLE/GS6 and competent review.
Read guidanceUse these links as source references when planning lifting operations. Always check the issuing body for the current revision before relying on a document for live works.
British Standard series for the safe use of cranes. Referenced for crane planning, supervision, lift categorisation and competent-person controls. Available to buy from BSI.
Technical note on assessing wind, crane configuration, load projected area, wind-sensitive loads and planning controls for lifting operations.
CLOCS resources for managing mobile crane activity, site access, road risk and construction logistics interfaces.
Strategic Forum/CPA guidance on ground bearing, plant platforms, loadings, temporary works coordination and ground suitability for construction plant.
HSE overview covering LOLER lifting equipment, lifting accessories, sling loading, SWL and avoiding unsuitable or damaged accessories.
HSE construction FAQ covering excavator safety topics, including excavators used for lifting operations and safe site controls.
CPA Plant Safety Group guidance on planning and executing lifting operations using 180 and 360 degree excavators.
LEEA document library entries for lifting accessories, slings, sling components, chain slings and documentation/marking guidance.
Free LEEA code of practice covering safe lifting equipment use, selection, inspection, training and lifting operation planning.
Practical tower crane operator guidance covering the operator's role within a trained, competent lifting team and safe system of work.
Tower Crane Interest Group technical note on wind effects, planning lifts around forecast wind speeds, in-service limits and safe tower crane operation.
HSE-recognised route into the free Strategic Forum and CPA tower crane guidance set, including erection, dismantling, inspection, maintenance and management topics.
Primary reference for planning work near overhead electric lines, including cranes, excavators, telehandlers and long-reach plant.
Approved Code of Practice and guidance for the Lifting Operations and Lifting Equipment Regulations 1998.
Approved Code of Practice and guidance for safe use of work equipment, relevant to lifting plant selection, maintenance and use.
Guidance for crane users on notification, obstacle marking and lighting where aviation safeguarding may apply.
Aerodrome safeguarding guidance for cranes and other tall construction equipment around aerodromes.
Asset protection and third-party works references for construction activity near Network Rail infrastructure.
Current controlled forms and guidance area for working on or about overhead line equipment where SAI25 applies.
CPA CIG/TCIG guidance for lifting equipment adjacent to railways controlled by Network Rail.
These apps can support planning checks for wind, weather, location and site context. They are aids only and do not replace competent assessment, calibrated site readings or an approved lift plan.
UK weather warnings, forecast wind speeds, gusts, rain radar and local conditions before lifting operations.
Wind and gust visualisation, forecast model comparison, nearby weather stations and changing weather patterns.
Exact 3m location references for remote sites, emergency locations, gate references and delivery entrances.
Site context, access routes, surrounding buildings, railway interfaces, terrain and general area review.
Sun path, shadows and visibility checks where glare or low sun may affect lifting, signalling or traffic interfaces.
For lifting in wind, record the forecast source, on-site reading method, wind limits, load sensitivity and the person authorised to stop the lift.
Every lift must still be checked against the site, plant, load, ground conditions, personnel and current documentation by a competent person.