A typical planning task
A drainage crew needs to place a precast chamber beyond an excavation. Record the chamber weight, lifting accessories and hitch weight, select the exact excavator configuration, and assess the planned pickup and placement positions. The plan can then bring the load schedule, site constraints and briefing information together for review.
Match the machine to the planned lift
Use the machine library to identify the excavator model and configuration. The relevant manufacturer lifting chart, duty, radius and height must match the actual setup. A similar model or an optimal position is not a substitute for the planned working position.
- Record boom, arm and machine configuration.
- Include accessories and attachments in gross lifted weight.
- Review capacity utilisation at the planned pickup and set-down positions.
Build a repeatable load schedule
Use preset construction loads as a starting point, or add site-specific weights and dimensions. For repeat operations, keeping load information and the selected rigging arrangement together makes the plan easier to check and brief.
- Prepare schedules for pipes, chambers, precast units and other materials.
- Confirm supplier weights and lifting-point information.
- Keep supporting documents with the plan for review.
Issue a plan the team can review
Record ground conditions, lifting team details, exclusion zones and proximity hazards before issue. PDF output supports briefing and document control. Competent planning and approval remain necessary; the software helps organise the evidence.
- Capture site conditions and restrictions.
- Keep revision and approval information together.
- Use independent verification where the scope requires additional review.
Explore the planning guidance and support
Read the plant-specific guidance before preparing your plan, and use professional support when additional review is needed.